{"id":1358,"date":"2020-03-11T17:24:34","date_gmt":"2020-03-11T17:24:34","guid":{"rendered":"http:\/\/flyjacksonville.com\/jetstream\/?p=1358"},"modified":"2020-03-11T17:24:34","modified_gmt":"2020-03-11T17:24:34","slug":"overnight-detour-planned-for-airport-road-and-airport-center-drive-march-17-2020","status":"publish","type":"post","link":"http:\/\/flyjacksonville.com\/jetstream\/overnight-detour-planned-for-airport-road-and-airport-center-drive-march-17-2020\/","title":{"rendered":"Overnight Detour Planned for Airport Road and Airport Center Drive &#8211; March 17, 2020"},"content":{"rendered":"<p>As part of the Florida Department of Transportation\u2019s Airport Road and I-95 interchange improvements project, detours of eastbound and westbound Airport Road are scheduled for March 17 from 8 p.m. to 6 a.m. for overhead sign work, weather and unforeseen circumstances permitting.<\/p>\n<p><strong>Airport Road Eastbound:<\/strong> Drivers heading east on Airport Road will take a right on Duval Road, take a right on Biscayne Boulevard, take a left on International Airport Boulevard, take the I-295 east on-ramp, continue to I-95 north and take the Max Leggett off-ramp. (See map below)<\/p>\n<p><a href=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-1.-3-17-2020-Road-Closure.jpg\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-1359\" src=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-1.-3-17-2020-Road-Closure.jpg\" alt=\"\" width=\"358\" height=\"230\" srcset=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-1.-3-17-2020-Road-Closure.jpg 358w, http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-1.-3-17-2020-Road-Closure-300x193.jpg 300w\" sizes=\"(max-width: 358px) 100vw, 358px\" \/><\/a><\/p>\n<p><strong>I-95 South to Airport Road:<\/strong> Drivers heading south on I-95 will continue to I-295, take I-295 west to the International Airport Boulevard exit, take a right and continue to Airport Road. (See map below)<\/p>\n<p><a href=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-2.-3-17-2020-Road-Closure.jpg\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-1360\" src=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-2.-3-17-2020-Road-Closure.jpg\" alt=\"\" width=\"358\" height=\"233\" srcset=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-2.-3-17-2020-Road-Closure.jpg 358w, http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-2.-3-17-2020-Road-Closure-300x195.jpg 300w\" sizes=\"(max-width: 358px) 100vw, 358px\" \/><\/a><\/p>\n<p><strong>Westbound Airport Road and I-95 North to Airport Road:<\/strong> Drivers headed west on Airport Road will take I-95 north to join drivers already on I-95. Drivers will then take the Pecan Park Road exit, take a left on Pecan Park Road, take a left on International Airport Boulevard and continue to Airport Road. (See map below)<\/p>\n<p><a href=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-3.-3-17-2020-Road-Closure.jpg\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-1361\" src=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-3.-3-17-2020-Road-Closure.jpg\" alt=\"\" width=\"356\" height=\"230\" srcset=\"http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-3.-3-17-2020-Road-Closure.jpg 356w, http:\/\/flyjacksonville.com\/jetstream\/wp-content\/uploads\/2020\/03\/Ph-3.-3-17-2020-Road-Closure-300x194.jpg 300w\" sizes=\"(max-width: 356px) 100vw, 356px\" \/><\/a><\/p>\n<p>Watson Civil Construction Inc. is expected to complete the $11 million project in spring 2020, weather and unforeseen circumstances permitting. For up-to-date information regarding construction projects, please visit <a href=\"http:\/\/www.nflroads.com\">www.nflroads.com<\/a> or contact FDOT at 904-831-FDOT.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the Florida Department of Transportation\u2019s Airport Road and I-95 interchange improvements project, detours of eastbound and westbound Airport Road are scheduled for March 17 from 8 p.m. to 6 a.m. for overhead sign work, weather and unforeseen circumstances permitting. Airport Road Eastbound: Drivers heading east on Airport Road will take a right&hellip;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[17,21],"tags":[],"_links":{"self":[{"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/posts\/1358"}],"collection":[{"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/comments?post=1358"}],"version-history":[{"count":1,"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/posts\/1358\/revisions"}],"predecessor-version":[{"id":1362,"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/posts\/1358\/revisions\/1362"}],"wp:attachment":[{"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/media?parent=1358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/categories?post=1358"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/flyjacksonville.com\/jetstream\/wp-json\/wp\/v2\/tags?post=1358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}